Collaborated with team members to complete project milestones.
• Set and leveled forms using laser level
• Operated power tools such as saws, drills, and other equipment related to the job.
• Cut rebar, poured, and smoothed concrete
• Dug and leveled areas for concrete pouring.
• Poured and spread concrete to smoothen and level surfaces.
• Smoothed and shaped surfaces with leveler/float
• Once the concrete was set we took off the stakes/boards,carried them up to the trailer
• Hole watch and confined space safety
• Assisted in scaffolding and secured safety harness systems
• Changed air filters and vacuum charcoal debris
• Drive around and make sure tools are put away
• Organized tools and equipment in an efficient manner to maximize productivity on job sites.