Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Naran-Od Naidandorj

Naran-Od Naidandorj

Summary

Skilled Steelfixer with a proven track record at various steelfixing companies, enhancing worksite safety and project efficiency. Good at interpreting blueprints and tying bars, demonstrating measurement accuracy and exceptional collaboration skills. Achieved significant contributions to major projects, including the Armadale line upgrade, Sydney metro, Brisbane Coomera bridge project by ensuring structural integrity and expediting construction timelines.

Overview

2
2
years of professional experience
1
1
Certification

Work History

Steelfixer

Castleross Construction
01.2024 - 12.2024
  • Walls, columns, slabs and etc. Responsible for every steelfixing around Armadale line upgrade project area.
  • Built and installed iron and steel girders, columns and other construction materials to form buildings, bridges and other structures.
  • Enhanced worksite safety by diligently following guidelines, regulations, and wearing appropriate personal protective equipment.
  • Sometimes do forming slabs when formworking staff need more people. Peri formwork

Steelfixer

REOFORM /ACCIONA/
05.2023 - 01.2024
  • Improved project efficiency by accurately reading and interpreting steel fixing plans and blueprints.
  • Enhanced worksite safety by diligently following guidelines, regulations, and wearing appropriate personal protective equipment.
  • Be a part of steelfixing team that has responsible for Super T beams at precast. Coomera project
  • Optimized production efficiency with routine equipment maintenance and cleaning at precast area.

Steelfixer

N&B Steelfixer
05.2023 - 07.2023
  • Studied blueprints and specification drawings to determine project requirements.
  • Ensured structural integrity by maintaining correct spacing between steel bars and ties according to specifications.
  • Optimized production efficiency with routine equipment maintenance and cleaning.
  • Optimized production efficiency with routine equipment maintenance and cleaning of sydney metro project.

Cellar Operator

Warburn Estate
02.2023 - 04.2023
  • Enhanced wine quality by monitoring and adjusting fermentation temperatures and processes.
  • Optimized production efficiency with routine equipment maintenance and cleaning.
  • Ensured accurate inventory management by maintaining detailed records of barrel movements, additions, and treatments.
  • Improved workplace safety by participating in regular training sessions and adhering to established guidelines.

Steelfixer & Formworker Hand

Super Struct LLC
07.2022 - 02.2023
  • Enhanced worksite safety by diligently following guidelines, regulations, and wearing appropriate personal protective equipment.
  • Expedited construction timelines with precise placement of steel bars, mesh, and reinforcements in concrete structures.
  • Ensured structural integrity by maintaining correct spacing between steel bars and ties according to specifications.

Education

White Card
Sydney

Asbestoss Awareness
Canberra

Bachelor of Science - Engineering Physics

University of Mongolian Building Engineer
Ulaanbaatar
05-2020

Skills

  • Measurement accuracy
  • Fast Tying hand
  • Hardworking

  • Collaboration
  • FLUENT IN English

Certification

RIW CARD

Pegasus card /Sydney metro/

Can drive but willing to take EWP tickets

Timeline

Steelfixer

Castleross Construction
01.2024 - 12.2024

Steelfixer

REOFORM /ACCIONA/
05.2023 - 01.2024

Steelfixer

N&B Steelfixer
05.2023 - 07.2023

Cellar Operator

Warburn Estate
02.2023 - 04.2023

Steelfixer & Formworker Hand

Super Struct LLC
07.2022 - 02.2023

White Card

Asbestoss Awareness

Bachelor of Science - Engineering Physics

University of Mongolian Building Engineer
Naran-Od Naidandorj