Mining operations, construction, and engineering management professional with over 8 years of experience on Rio Tinto's flagship project, Oyu Tolgoi Copper, the fourth largest copper mine in the world.
- Responsible for the pre operation, mid term operation and maintenance and equipment up to 35 kV, including underground material handling system and conveyor to surface area electrical substation and all instruments
- Successfully completed the Underground Material Handling System 1 project, which included the Primary Gyratory Crusher and Conveyor System at Oyu Tolgoi Underground Mining.
- Successfully completed the Underground Booster fan project, which included the Underground high and low voltage electrical substation and 400V balance and Booster fans at Oyu Tolgoi Underground Mining.
- Successfully completed the Underground Truck Workshop and Main workshop projects at Oyu Tolgoi Underground mining
- Conducted inspections and performed test adjustments necessary for the commissioning of safety instruments in accordance with established processes. Executed proof tests to verify the operation of functional safety instruments / Belt scale Weight Transmitters, FIT, PIT, TI, TIT, Conveyor Safety Devices, Encoder etc../
- Successfully completed the Central Heating Plant Expansion project at Oyu Tolgoi Underground Mining, which included the 2x29MW Hot Water Boiler and all necessary equipment.
- Successfully completed the Underground Critical Facility project at Oyu Tolgoi Underground Mining, which included the Underground Jaw Crusher and Explosive magazine all necessary equipment.
- Successfully completed the Tselmeg Substation project, which included the installation of a 35/6kV transformers, high-voltage switchgear, and the pulling and termination splicing of 35kV cables in downtown Ulaanbaatar.